End work period with open tickets

Hi all,

I have a setup where the cashier needs to enter the float in and out.
I already set up the dine-in open tickets to pre-order and I can end the work period from the work period button.
but I can not end the period from the cash management section which asks me to clear unpaid tickets.
could you help me with that, please?
I have attached the DBzezenya123456_202003181614SQM.zip (1.7 MB)

You don’t need to end work period to do the cash count on shift change. Work period should be used for your day not shifts. You can use custom reports to track shifts and floats.